Code:
BGKY C21 21.3.01.c Sidewalks, Ramps, Entrances w/out approval or w/o meeting standards Public Infrastructure, Rights-of-Way and Stormwater / Construction, Repair, Permitting and Maintenance / Infrastructure Requirements
Code Description:
c. Any person proposing or constructing sidewalks, handicap ramps or drive entrances on public right-of-way shall have prior approval through permitting or plan approval by the Public Works Director or designee. All design and construction must meet Americans with Disabilities Act (ADA) requirements, being 42 U.S.C. 12101, et seq., as well as all requirements in the City’s Traffic Management Manual, as set out in Chapters 21 (Public Infrastructure, Rights-of-Way and Stormwater) and Chapter 22 (Traffic and Motor Vehicles) of the City Code of Ordinances, and other requirements as determined by the Public Works Director or designee. Good afternoon,
After my inspection today, the following is not meeting EPSC guidelines. There is mud tracked out in the roadway, neighboring entrance is being utilized as a construction entrance now and has been damaged due to this, grade is holding water at front foundation of house and by roadway where trench has been dug, Illicit discharge piles, grade needs stabilization, No Best Management Practices installed for silt control in some areas in the side and rear of property and what little is at the front of the property, is not maintained, no permit or SWPPP posted on site, Trash and construction debris not cleaned up nor contained properly, construction entrance is not appropriate, nor installed correctly, Re-inspection for Compliance on 7/31/25. Day to Day fines will begin until compliance is met.